Keep the elevator drawings coordinated with the house
Assign responsibility for checking equipment revisions against architectural, structural and electrical plans. Include doors, landing finishes and the intended passenger route at every stop. Before handover, confirm the required inspections, operating instructions and ongoing support. Interior styling can then follow a layout that already meets the project’s functional requirements.
Coordinate the elevator and building approvals
Washington L&I provides the elevator permit process. Have the installer coordinate the equipment requirements with any local structural, building and electrical work. Confirm the inspection and handover arrangements for the selected installation before it enters use.
See the broader home elevator installation options at Auburn Home Elevators.